HDD crossing for Masseha Canal 70 m. length by installing 2 Polyethylene pipes 8 diameter, 11.9 mm. thickness, to be in the bottom at least 1.5 m. distance by passing the cable with the main pipes then make backup guide
Project Owner: | South Delta Company |
Client Name: | South Delta Company |
Country: | Egypt |
Duration: | Week |
Execution Period: | 3 days |
Year of Contract: | 2018 |