HDD crossing for Masseha Canal 70 m. length by installing 2 Polyethylene pipes 8 diameter, 11.9 mm. thickness, to be in the bottom at least 1.5 m. distance by passing the cable with the main pipes then make backup guide

Project Owner: South Delta Company
Client Name: South Delta Company
Country: Egypt
Duration: Week
Execution Period: 3 days
Year of Contract: 2018

HDD for crossing Bahar Seif 150 m. length by installing 2 Polyethylene pipes 8 diameter, 11.9 mm. thickness, to be in the bottom at least 1.5 m. distance by passing the cable with the main pipes then make backup guide

Project Owner: South Delta Company
Client Name: South Delta Company
Country: Egypt
Duration: Week
Execution Period: 4 days
Year of Contract: 2018

HDD for crossing Batanonya Canal 200 m. length by installing 3 Polyethylene pipes 8 diameter, 11.9 mm. thickness, to be in the bottom at least 1.5 m. distance by passing the cable with the main pipes then make backup guide

Project Owner: South Delta Company
Client Name: South Delta Company
Country: Egypt
Duration: Week
Execution Period: 4 days
Year of Contract: 2018

HDD for crossing Tala Sewer by installing 3 Polyethylene pipes 8 diameter, 11.9 mm. thickness, to be in the bottom at least 1.5 m. distance by passing the cable with the main pipes then make backup guide

Project Owner: South Delta Company
Client Name: South Delta Company
Country: Egypt
Duration: Week
Execution Period: 6 days
Year of Contract: 2018

HDD for crossing Mahala Rouh Sewer 120 m. length by installing 3 Polyethylene pipes 8 diameter, 11.9 mm. thickness, to be in the bottom at least 1.5 m. distance by passing the cable with the main pipes then make backup guide

Project Owner: South Delta Company
Client Name: South Delta Company
Country: Egypt
Duration: Week
Execution Period: 6 days
Year of Contract: 2018

HDD for crossing Tala Sewer 120 m. length by installing 4 Polyethylene pipes 8 diameter, 11.9 mm. thickness, to be in the bottom at least 1.5 m. distance by passing the cable with the main pipes then make backup guide

Project Owner: South Delta Company
Client Name: South Delta Company
Country: Egypt
Duration: Week
Execution Period: 6 days
Year of Contract: 2018

HDD for crossing Toukh Sewer 100 m. length by installing 3 Polyethylene pipes 8 diameter, 11.9 mm. thickness, to be in the bottom at least 1.5 m. distance by passing the cable with the main pipes then make backup guide

Project Owner: South Delta Company
Client Name: South Delta Company
Country: Egypt
Duration: Week
Execution Period: 3 days
Year of Contract: 2018

HDD for crossing Kafr Tanabdy Canal 100 m. length by installing 3 Polyethylene pipes 8 diameter, 11.9 mm. thickness, to be in the bottom at least 1.5 m. distance by passing the cable with the main pipes then make backup guide

Project Owner: South Delta Company
Client Name: South Delta Company
Country: Egypt
Duration: Week
Execution Period: Under construction
Year of Contract: 2018

Al Batanonya Canal crossing 200 m. length by installing 3 Polyethylene pipes 8 diameter, 11.9 mm. thickness

Project Owner: South Delta Company
Client Name: South Delta Company
Country: Egypt
Duration: Week
Execution Period: Under construction
Year of Contract: 2018

Egypt Railways “Tanta, Menoufya” crossing 110 m. length by installing 3 Polyethylene pipes 8 diameter, 11.9 mm. thickness

Project Owner: South Delta Company
Client Name: South Delta Company
Country: Egypt
Duration: Week
Execution Period: Under construction
Year of Contract: 2018

HDD for two crossing Al Batatonya Canal 200 m. length for each by installing 3 Polyethylene pipes 8 diameter, 11.9 mm. thickness, to be in the bottom at least 1.5 m. distance by passing the cable with the main pipes then make backup guide

Project Owner: South Delta Company
Client Name: South Delta Company
Country: Egypt
Duration: Week
Execution Period: Under construction
Year of Contract: 2018

HDD for crossing Al Batatonya 200 m. length by installing 3 Polyethylene pipes 8 diameter, 11.9 mm. thickness, to be in the bottom at least 1.5 m. distance by passing the cable with the main pipes then make backup guide

Project Owner: South Delta Company
Client Name: South Delta Company
Country: Egypt
Duration: Week
Execution Period: Under construction
Year of Contract: 2018

HDD for crossing in the bottom of Agriculture Road- Al Qassed Canal- Al Cournich 200 m. length by installing 8 Polyethylene pipes 8 diameter, 11.9 mm. thickness, to be in the bottom at least 1.5 m. distance by passing the cable with the main pipes then make backup guide

Project Owner: South Delta Company
Client Name: South Delta Company
Country: Egypt
Duration: Week
Execution Period: Under construction
Year of Contract: 2018

HDD for crossing in the bottom of Tanta, Al Mahala Road and the Railway 200 m. length for each by installing 8 Polyethylene pipes 8 diameter, 11.9 mm. thickness, to be in the bottom at least 1.5 m. distance by passing the cable with the main pipes then make backup guide

Project Owner: South Delta Company
Client Name: South Delta Company
Country: Egypt
Duration: Week
Execution Period: Under construction
Year of Contract: 2018

HDH for crossing in the bottom of The Railway, South Mahala Branch 60 m. length for each by installing 8 Polyethylene pipes 8 diameter, 11.9 mm. thickness, to be in the bottom at least 1.5 m. distance by passing the cable with the main pipes then make backup guide

Project Owner: South Delta Company
Client Name: South Delta Company
Country: Egypt
Duration: Week
Execution Period: Under construction
Year of Contract: 2018

HDD for crossing Al Naggar, Sewer AL Khour side 120 m. length by installing 4 Polyethylene pipes 8 diameter, 11.9 mm. thickness, by passing the cable with the main pipes then make backup guide

Project Owner: South Delta Company
Client Name: South Delta Company
Country: Egypt
Duration: Week
Execution Period: Under construction
Year of Contract: 2018

HDD for crossing Egypt Railways “Menoufya, Ashmoon”, + Ashmoon Sewer 120 m. length by installing 4 Polyethylene pipes 8 diameter, 11.9 mm. thickness, by passing the cable with the main pipes then make backup guide

Project Owner: South Delta Company
Client Name: South Delta Company
Country: Egypt
Duration: Week
Execution Period: Under construction
Year of Contract: 2018

HDD for crossing Al Naggar, Sewer AL Khour side 120 m. length by installing 4 Polyethylene pipes 8 diameter, 11.9 mm. thickness, by passing the cable with the main pipes then make backup guide

Project Owner: South Delta Company
Client Name: South Delta Company
Country: Egypt
Duration: Week
Execution Period: Under construction
Year of Contract: 2018

HDD for crossing Al Naggar Sides- Al Naggar Canal- Talia / Al Kawady paved road, 250 m. length by installing 4 Polyethylene pipes 8 diameter, 11.9 mm. thickness, by passing the cable with the main pipes then make backup guide

Project Owner: South Delta Company
Client Name: South Delta Company
Country: Egypt
Duration: Week
Execution Period: Under construction
Year of Contract: 2018