Ansaldo Energia

2014

Interconnection HV Cable 220 KV between Ansaldo Power Plant to GIS S/S, 4 Circuits, Route Length 9.5 KM.

Project Owner: Ansaldo Energia
Client Name: Egy-Tech Cables Egypt
Country: Egypt
Duration: 3 months
Execution Period: 1 months
Year of Contract: 2014

2011

Interconnection HV Cable 220 KV between Ansaldo Power Plant to GIS S/S, 4 Circuits, Route Length 8 KM.

Project Owner: Ansaldo Energia
Client Name: Egy-Tech Cables Egypt
Country: Egypt
Duration: 3 months
Execution Period: 15 days
Year of Contract: 2011