SOUTH DELTA COMPANY PROJECTS
2018

Passing 11 KV cables with 4 circles, from St. Ahmed Lotfy then passing in the bottom of St. Faisal to St. Abou El Khier Mosque
HDD for El Nile crossing Imbaba


HDD for Autostrad to pass 8 cables and 14 pipes
HDD under the subway in Ain Helwan Metro Station to pass Polyethylene pipes 8 diameter


Passing Polyethylene pipes 8 diameter, under ( railways, subway, waterways, roads) assignment order no. (211) St. Luxor
Passing Polyethylene pipes 8 diameter, under ( railways, subway, waterways, roads) assignment order no. (212) St. Airport
