SOUTH DELTA COMPANY PROJECTS
2018

The process of reinforcing the corners of the towers and replacing the conductors of Al Omayed / El Alamin line with 66 KV with heat conductors and the installation of rubber insulation chains
HDD for interconnection cables 220 KV between Imbaba Station and Meatmedya station


HDD for interconnection Saqer Qouraish Station, Gardenia and The Airport
Construction of 66 KV double-circuit cable, type XLPE strip (1 x 400 mm 2), to connect with The North Ismailia Station


Al Obour City 1 Crossing
Al Obour City 2 Crossing


HDD for construction lines and provision cables 220 KV. and set the overhead lines (Al Shorouq City) 66 KV.
Connect Al Marg Generator Station with the new Takreer Petrol Generator Station 66 KV. Cables (Mustorod)


Installing process 66 KV cables, type XLPE strip (1 x 400 mm2), copper covered by lead, and full fiber cables with accessories to set the 1st Settlement 66 KV with double circle ground cables, strip (1 x 400 mm2), 3.5 m. length
Connect Al Hadaba Generator Station with Cairo Generator Station 500
(Ghataty stage No. 26)
(Ghataty stage No. 26)


Connect Al Hadaba Generator Station with Cairo Generator Station 500
(Al Terssa stage No. 4)
(Al Terssa stage No. 4)
Connect Al Hadaba Generator Station with Cairo Generator Station 500
(Mashaal stage No. 6)
(Mashaal stage No. 6)


Connect Al Hadaba Generator Station with Cairo Generator Station 500
(stage No. 6)
(stage No. 6)
Connect Al Hadaba Generator Station with Cairo Generator Station 500
(stage No. 10)
(stage No. 10)


Connect Al Hadaba Generator Station with Cairo Generator Station 500
(stage No. 11)
(stage No. 11)
Connect Al Hadaba Generator Station with Cairo Generator Station 500
(stage No. 13)
(stage No. 13)


Connect Al Hadaba Generator Station with Cairo Generator Station 500
(stage No. 15)
(stage No. 15)
Connect Al Hadaba Generator Station with Cairo Generator Station 500
(stage No. 17)
(stage No. 17)


Connect Al Hadaba Generator Station with Cairo Generator Station 500
(stage No. 23)
(stage No. 23)
Crossing Sherweeda railway, Al Canal Electricity Station ( El-Zaggazig)


Connect West Cairo Generating Station with Imbaba Generator Station,
220 KV cables (Al Manashy)
220 KV cables (Al Manashy)
Connecting project Ramses Metro Station / Al Abbasya Metro Station
(Al Sekka Al Baydaa)
(Al Sekka Al Baydaa)


HDD to connect two electricity stations 66 KV double circle in El Marg Area in the bottom of the subway
Connecting project Ramses Metro Station / Al Abbasya Metro Station
(Al Sekka Al Baydaa)
(Al Sekka Al Baydaa)


Connecting project Ramses Metro Station / Al Abbasya Metro Station
(Salah Salem)
(Salah Salem)
HDD for interconnection MV cables 66 KV between El-Maasara ss and New Assuit ss. (Canal)


HDD for interconnection MV cables 66 KV between El-Maasara ss and New Assuit ss. (Nile)
HDD for interconnection MV cables 220 KV between west of Cairo S/S to new Imbaba SS, route length 220 m (El- Koum El-Ahmer)


HDD for interconnection MV cables 220 KV between west of Cairo S/S to new Imbaba SS, route length 144 m (the ring regional)
HDD for interconnection MV cables 220 KV between west of Cairo S/S to new Imbaba SS, route length 200 m (Bashteel)


HDD for interconnection MV between Maadi S/S to El-Sakaken under Zahraa
El-Maadi Tunnel SS
El-Maadi Tunnel SS
HDD for interconnection MV between El-Koraymat keys S/S to El-Basateen In Cairo under the railway


HDD for interconnection MV between El-Koraymat keys S/S to El-Basateen In Cairo under the Autostorad road under the ring road
Crossing by HDD in the Ring Road for interconnection between Sharm El- Sheikh (220 KV) to Sharm El-Sheikh generator cables (220 KV) & 8 inch pipe and 2 pipes for the Viper Optics Cables (8 Crossing)


Crossing by HDD in Hurghada, for 220 KV 12 pipes each 8 inch & 2 pipes each 4 inch (14 Crossing)
CHDD for interconnection MV cables 500 KV at West of Assuit S/S stage (1)


HDD for interconnection MV cables 500 KV at West of Assuit S/S stage (2)
HDD under Abd El-Hamid Badawy Road (Airport), for number of 7 HDPE pipe, each 10 Inches, Route Length 220 linear m.


HDD under Autostrad Road for Abbasiya Metro project, for number of 7 HDPE pipe, each 10 Inches, Route Length 220 linear m.
Al Nahda – Algabal Al asfar


ALBadary
Zahraa Nasr City


Alex West